1. Foundations and Ground Floor

a. Ground floor perimeter edge insulation

Key Points:

  • Photograph should show a continuous strip of insulation in contact with the walls around the perimeter of the ground floor
  • Ensure minimum 25mm perimeter edge insulation is visible.
  • Photo is best taken prior to casting screed.

Example 1.a Photograph:

SAP PSI junction reference – E5